Showing posts with label Dalpol. Show all posts
Showing posts with label Dalpol. Show all posts

28 April, 2016

3D model and panoramic view

The Dalpol boatyard has just released a 3D model of their sailboats. It's not very accurate compared to the real boat, but still cool. Check this Link to page if the preview bellow does not work.


This is the 360° panoramic view of the charter version:


and the deluxe version:


More information on the official website.

23 June, 2014

Getting ready for the first splash

Chapter 1: Getting ready for the first launch

Over the last weekend we finished preparing for the first launch. I had to put on the labels and the boat name and my wife did the last cleaning and storing all kinds of dishes and stuff.

boat name and registration number
I'm planning to add the waterline stripes, but I have to measure it when the boat is in the water. 

7.5kg Bruce anchor

nice and cozy .. not for so long, once the kids will start to play :-)



pillows and sleeping bags




Chapter 2: Getting ready for the first reclaims

Two weeks ago, we had to reclaim the gelcoat stress cracks in the inner laminate under the cabin ladder.

stress cracks on the bilge inspection hole
inspection hole (rectangle support frame between the hull and inner layer)

collapsed inner laminate layer on the top of the ladder
It turned out to be caused by the wrong placement of the boat on the trailer, resp. the keel rollers were in bad positions and were pushing the hull against the deck through the ladder. According to the factory 90% of the boat weight should rest on the keel area bellow the centerboard where the ballast is located.

the left roller should not be there !!!
The trailer was, however prepared by the dealer which was not aware of this weak point of the construction. The factory guys confirmed that they had the same issue in the past. Anyway, they went to the dealer and fixed the issue. The dealer modified the trailer by adding two more bunks and shortened the ladder by a few millimeters, but the crack on the top of the ladder appeared again ... oh well.
We then decided that he will rebuild the trailer completely so the keel area will be supported by two large bunks instead of the rollers. These bunks spreads the load much better now, but only time can tell.
So now we have to live with a few stress cracks in inner layer :(
 
I would highly recommend to ask for all mandatory documentation to the boat like the manual, the crane lifting area and the more importantly how to store the boat on the trailer properly !!!
Problem with Dalpol is that they do not provide any kind of the manual.

repair done by Mr. Linhart (not as good as the initial fix by the factory)

factory fixed only the cracks on flat surfaces and not in the non-skid
I was told that repairing the non-skid is not easy. Hmm, nothing new to me. I know that it can be fixed as you have a piece of the non-skid mold, but I can live with that. I will probably fix it by myself later on when I have a time, but now I'm focused on getting her ready. It's about the time.

factory added more layers of the fiberglass
I have also some very thin cracks on the sides of the floor in the same area, but this is not a big deal.
Don't forget that we have hull #27 so it's not perfect. On the other side, I have to admit that all were repaired pretty fast in 14 days.
This was also nice opportunity to drive a few hundreds of km and practice the behavior of the loaded trailer when I was moving the boat back and forth to the dealer.

When I was in the mood of modifying the trailer I've changed the front bow stop. Originally there was pretty bad carpet, which was stretching the bow. So I cut the pads with the carpet and replaced it with the V shaped thermoplastic bow stop which does not make any stains.

modified bow stop

19 December, 2013

Born of the boat II.

I've just arrived from the visit of the Dalpol boatyard to check the status of our boat. I was pretty surprised by the size of the factory. I was expecting something big, but it seems legit as their production is around 80 boats per year.

I was looking around our boat for more than an hour taking pictures as much as I can. Found some issues with hardware mounting, but they make sure it will be fixed. Anyway the boat should be finished by the end of this month as it seems they were just finishing the interior woodwork.
Great Christmas present, isn't it?

Here are just some of the picked photos from the huge collection I made. I will make the rest of the gallery online later. Click on the picture to walk through the gallery in higher resolution.

factory entry

boat parts shop & office

assembly hall

Phobos 21 hull mold

Phobos 21 hull mold

metal workshop

wood workshop

assembly hall - kind of dusty :-)
(from the left Phobos 21, 25 and 22)

our boat






aft berth & galley
frame of the cabinets

cabin locker with electrical panel

head room

mast support

water tank

seating in the cabin

aft berth window

center board with antifouling paint

Plexiglas acrylic windows

cabinets are getting final shape


water inlet & tank vent

rudder and its mold

assembled masts and booms

woodwork templates for various models

Airex core (green color) in the laminate part

14 December, 2013

Dalpol boatyard visit

Just received a call from the local dealer that he is going to pick up someone else's boat so I'm going with him to visit the Dalpol boatyard in Poland and see the progress on our boat.
I'm taking a camera with me, so stay tuned for more photos.


See on Google maps

10 December, 2013

Born of the boat I.

It took over two months since we ordered the boat and now we received these pictures from the boatyard. There is still much of the work, but getting closer.

cabin top (optional quad-stoppers)


optional rigid fresh water tank with inspection hole


galley

head with sink

optional cockpit window and bracket for 10HP outboard

Stay tuned for more...